FlowPlan Projects: Engagement Roadmap

The engagement roadmap describes how FlowPlan support can be applied across a project, from early definition and route development through procurement, integration, commissioning and performance review. It shows the decisions, technical work and deliverables available for sewage and effluent treatment, treated water reuse, biosolids, and equipment and utilities projects. An engagement can cover the full sequence or a defined part of it, depending on the work already completed and the next requirement.

Engagement roadmap hero image
Overview
The roadmap shows the support available at each project stage, the decisions addressed and the outputs required to move the work forward.
Project basisRoute developmentProcurementIntegrationCommissioningPerformance review

Project engagement basis

The roadmap describes the support available from early project definition through requirements, proposal evaluation, integration, commissioning and performance review. Each engagement is matched to the work already completed and the next decision or deliverable required.

Engagement pathways: The three pathways group the work into three broad areas: decision basis; requirements and evaluation; and delivery and verification. The six roadmap stages below show how these pathways translate into project deliverables.

Decision basis Requirements and evaluation Delivery and verification

1) Project decision and existing information

The engagement scope depends on the decision required, the information already available and the review points needed before the next commitment.

  • Project condition: new build, retrofit, expansion, underperformance or a project already in procurement or delivery, including shutdown constraints and operating continuity.
  • Required duty: compliance, capacity, reuse, recovery, residuals management, reliability or operating-cost reduction.
  • Existing information and review points: characterization, existing studies or supplier information, design criteria, KPIs, commissioning and acceptance requirements.

3) Deliverables, responsibilities and system connections

The engagement basis records the information, responsibilities, system connections and review points required at each stage, including what must be confirmed before procurement, installation, commissioning and handover.

Flow, load and quality basis
Required duty and outlet conditions
Site, utility and system connections
Residuals, reject and fallback routes

Project Roadmap

Opportunity Scan

Project Basis & Feasibility

Stage focus: Project trigger, required duty, constraints and decision criteria

Stage result: Project need, existing information, data gaps, feasible directions and work needed to progress

Typical inputs: Project information, characterization data, site constraints, option comparison and risk review

Deliverables: Project Basis Note / Feasibility Report

Specification

Route Development & Design Basis

Stage focus: Selected route and performance requirements

Stage result: Process logic, design conditions, system connections, controls and operating requirements

Typical inputs: Design criteria, route comparison, process calculations, layout and utility review

Deliverables: Design Basis, Preliminary Flow Diagram

Requirements & Vendor Evaluation

Requirements & Vendor Evaluation

Stage focus: Comparable procurement requirements and proposal evaluation

Stage result: ToR or specifications, evaluation criteria, clarification requirements and proposal comparison

Typical inputs: Requirements matrix, compliance schedule, technical and lifecycle comparison

Deliverables: ToR / Specification Pack, Vendor Evaluation Report

Recovery & Reuse

Integration & Delivery Planning

Stage focus: Site, equipment and delivery coordination

Stage result: Layout, utilities, connections, responsibilities, sequencing and shutdown requirements

Typical inputs: Connection schedule, responsibility matrix, layout and installation review

Deliverables: Integration and Implementation Plan

Implementation

Commissioning & Handover

Stage focus: Installation, controls and operating readiness

Stage result: Commissioning steps, acceptance tests, operator preparation, documentation and handover requirements

Typical inputs: Commissioning plan, test sheets, KPI and alarm schedule

Deliverables: Commissioning and Acceptance Report

Performance Review

Performance Review & Optimization

Stage focus: Performance under operating conditions

Stage result: Performance against the defined duty, shortfalls and corrective or optimization actions

Typical inputs: Operating data, performance trends, operator logs and KPI review

Deliverables: Performance Review and Optimization Plan

Milestones Project Milestones

Definition
Delivery
Verification
Definition
Milestone 1

Milestone 1


Project Basis Note / Feasibility Report

Defines the trigger, required duty, constraints, initial routes and next work.

Definition
Milestone 2

Milestone 2


Design Basis & Preliminary Flow Diagram

Records the selected route, design conditions, system connections and controls.

Definition
Milestone 3

Milestone 3


ToR / Specification Pack & Vendor Evaluation Report

Establishes comparable requirements and records the proposal evaluation.

Delivery
Milestone 4

Milestone 4


Integration & Implementation Plan

Sets layout, connections, responsibilities, sequencing and installation requirements.

Delivery
Milestone 5

Milestone 5


Commissioning & Acceptance Report

Records commissioning checks, acceptance tests, operator preparation and handover.

Verification
Milestone 6

Milestone 6


Performance Review & Optimization Plan

Compares operating results with the defined duty and records required actions.

Project Engagement Examples

Route:

Biosolids - Composting

The composting project is based on a defined biosolids quantity and quality, bulking-material supply, process controls, intended outlet and fallback route.

  • Route considerations: Thickening or dewatering, mixing, composting method, curing, screening, storage and residuals handling as required.
  • Decision points: Feed quality and contaminants, stabilisation, bulking supply, pathogen and receiving criteria, site capacity, outlet and fallback.
  • Verification: Moisture, temperature-time control, stability, pathogens, contaminants and product quality as required.
Feed and bulking basis Process controls Outlet and fallback

Engagement scope and deliverables

Illustrative starting point: Decision Basis & Feasibility.

  • Deliverables: Feed and product basis, process and quality-control requirements, outlet review and fallback plan.
  • Project basis: Whether composting is technically and operationally viable and the conditions required for a dependable outlet.

Note: These examples are illustrative. The engagement scope, route elements and deliverables are defined from the project condition, available information and decisions required.

Get in touch

The initial review considers the project need, current stage and decision required. The engagement scope is then defined around the information already available, required duty, procurement status and work needed to progress.

  • Project type and current condition (new build, retrofit, underperformance, reuse, biosolids or equipment)
  • Required duty and outlet (compliance, capacity, reuse, recovery, residuals or operating-cost reduction)
  • Available data and constraints (flow, load, quality, space, utilities, shutdowns and operator capacity)
  • Procurement and delivery status (EPC or supplier engagement, approvals, responsibilities and schedule)
  • Immediate decision or deliverable required (basis, comparison, specification, commissioning or performance review)